2024.10.22

PU Shoe Mechanism Shoe Production Process

0

Step1: Prepare raw materials

Prepare the required raw materials in parts by weight and put them into the raw material preheating oven to heat them
(the required temperature of the raw materials depends on the data) to completely melt them.

Step2: Mix raw materials

Add catalyst and color paste to the melted raw material liquid to obtain a mixed liquid

Step3: Injection

Pour the mixed liquid into the raw material tank, and transport it to the pouring machine head device through the metering pump to stir the raw materials so that the raw materials are evenly mixed together

Step4: Forming

Inject the evenly mixed polyurethane liquid into the sole or shoe mold and seal the shoe mold with a lid

Step5: Heating and aging

The capped shoe mold enters the drying tunnel of the production line for heating and maturation, so that the sole in the shoe mold is foamed. After the sole is cooled and solidified, the de moulding operation is performed

Step6: Trimming and finishing

Trim and organize the soles, and pack them into warehouse after passing the inspection.
0

QUESTIONS & 

We are committed to excellence in everything we do and look forward to working with you!

Call us

Whatsapp: +86 13806856387

Wechat:13806856387

E-mail:sales@jinguangpu.com

Affiliation people:Mr.Zhang

CONSULTING

HOME

PRODUCTS

ABOUT  US

CONTACT US

JINGUANG

SHOE 

MACHINE

© RUIAN JINGUANG POLYURETHANE EOUIPMENT CO.LTD